30x30 Concrete Slab How Many Yards Calculator

Updated 2026-05-13

A 30x30 slab is 900 square feet. At 6 inches thick, it needs about 16.67 cubic yards of concrete before waste, so plan delivery timing, control joints, reinforcement, base prep, and enough finishers.

Quick estimate: 19.17 cubic yards for 30 ft by 30 ft slab, 6 in thick, with 15% waste.

Concrete for a 30x30 large slab

A 30 ft by 30 ft footprint is 900 sq ft. At 6 inches thick, the slab volume is about 16.67 cubic yards before waste. With 15% waste, the planning number is about 19.17 cubic yards.

Thickness changes the order

The default thickness on this page is 6 inches. Changing thickness from 4 inches to 6 inches increases concrete volume by 50%, so verify the planned thickness before comparing bagged concrete or ready-mix.

Ready-mix, bags, and site planning

For this slab size, ready-mix is usually the practical comparison point. Delivery timing, access, finishing crew, control joints, base prep, and reinforcement should be planned separately from the cubic-yard math.

Common concrete slab sizes

Cubic yards below are before waste. Add your project waste percentage before ordering.

Slab size4 in thick5 in thick6 in thick
10 ft x 10 ft1.23 cu yd1.54 cu yd1.85 cu yd
10 ft x 12 ft1.48 cu yd1.85 cu yd2.22 cu yd
12 ft x 12 ft1.78 cu yd2.22 cu yd2.67 cu yd
20 ft x 20 ft4.94 cu yd6.17 cu yd7.41 cu yd
24 ft x 24 ft7.11 cu yd8.89 cu yd10.67 cu yd
30 ft x 40 ft14.81 cu yd18.52 cu yd22.22 cu yd

Before you calculate

  • Measure the actual formed length and width in feet.
  • Enter slab thickness in inches, then handle thickened edges or footings as separate estimates.
  • Break irregular slabs into rectangles so the volume calculation stays transparent.

Common mistakes

  • Using square feet without converting thickness into volume.
  • Missing thickened edges, turndowns, steps, or separate pads.
  • Ordering exactly the calculated amount with no allowance for site variation.

Formula

cubic yards = (length * width * (thickness / 12) / 27) * (1 + wastePercent / 100)

Assumptions

  • Defaults match a 30x30 slab footprint.
  • Thickness is entered in inches.
  • The result is cubic yards for quantity planning.

Example

Estimated concrete needed (cubic yards): 19.17 cubic yards

How to use this calculator

  1. Enter length in ft.
  2. Enter width in ft.
  3. Enter thickness in in.
  4. Enter waste in %.
  5. Review the live estimate and compare it with the example result.
  6. Check the formula, assumptions, product labels, and site conditions before using the 30x30 Concrete Slab How Many Yards Calculator result to plan materials.

Before you buy materials

  • Compare cubic yards, cubic feet, and bag counts before deciding between ready-mix and bags.
  • Confirm final slab details with plans, product labels, or a qualified professional when accuracy matters.

FAQ

What is the example 30x30 concrete slab how many yards cubic-yard result?

Use length, width, thickness or depth, and waste, then calculate the planning result. In the default example, the result is 19.17 cubic yards.

How many yards of concrete for a 30x30 slab?

At 6 inches thick, a 30x30 slab needs about 16.67 cubic yards before waste and about 19.17 cubic yards with 15% waste.

How many square feet is a 30x30 slab?

A 30 ft by 30 ft slab is 900 square feet. Square footage must still be converted to volume using slab thickness.

Should I use 4 inches or 6 inches for a 30x30 slab?

This calculator estimates quantity only. Required thickness depends on use, load, base, reinforcement, local code, and project plans. Changing thickness has a large effect on cubic yards.

Should I order exactly the calculator result?

No. Use the result as a planning number, keep a waste buffer visible, and confirm final rounding, minimum orders, and delivery rules with the supplier.